Gallery archive

Strengthening infrastructure is one of the most important goals of the Arak metropolitan municipality

Region 4

04/07/2026

Strengthening infrastructure is one of the most important goals of the Arak metropolitan municipality

According to the Communications and International Affairs Department of the Arak metropolitan municipality, with the implementation of extensive improvement and renovation projects across the city, we are witnessing an increase in the quality of public services, beautification of the environment, and greater public satisfaction. One of these projects is asphalt paving operations aimed at improving streets and facilitating the movement of citizens and traffic in District 4 of the Arak municipality.

Infrastructure development steps in District 4 of Arak Metropolitan Municipality continue

Region 4

04/07/2026

Infrastructure development steps in District 4 of Arak Metropolitan Municipality continue

According to the Communications and International Affairs Department of Arak Metropolitan Municipality, District 4 of Arak Metropolitan Municipality, in line with improving urban infrastructure, has recently distributed 200 tons of asphalt across the district's streets and roads. In addition, as part of ongoing construction activities, 142 meters of curb installation have been carried out to improve surface water drainage and organize the streets. These measures have been taken to enhance the quality of urban services and increase citizen satisfaction.

Paving of the alleys of Sheikh al-Islam and Agha Zia al-Din in Arak's historic bazaar

Region 4

11/07/2026

Paving of the alleys of Sheikh al-Islam and Agha Zia al-Din in Arak's historic bazaar

The manager of the historic fabric district of Arak Municipality said: In line with preserving and maintaining the valuable historic bazaar complex and with the aim of improving the passages and alleys of the bazaar, the paving and stone-paving operations of the Sheikh al-Islam and Agha Zia al-Din alleys of this complex, from the Mohseni Street side, are underway. According to the Public Relations and International Affairs Department of Arak Municipality, Hossein Mansouri Zadeh added in announcing the news: Considering the deterioration of the asphalt in the Sheikh al-Islam and Agha Zia al-Din (second and sixth) alleys of the historic bazaar from the Mohseni Street side, and the inconsistency of the asphalt with the structure of this historic complex, the stone-paving operation of these alleys has been placed on the district's agenda. He further noted: The executive operation of stone-paving the Sheikh al-Islam alley has been completed, and the removal of the asphalt in the Agha Zia al-Din alley from the Mohseni Street side has been carried out, and with the participation of the municipality and the electricity department, the removal of the electricity poles in this alley in order to continue the substructure and stone-paving operations is underway. At the end, the manager of the historic fabric district of Arak Municipality thanked the bazaar shopkeepers and citizens for their cooperation with the municipality in carrying out construction and restoration measures in the Arak historic bazaar complex.